A 20-Year Quality Tracking Programme

Since 2001, SHEMAR has maintained a systematic quality-tracking plan covering routine aging inspections of in-service products, sampling under representative weather conditions, and collaborative testing with utilities, research institutes, and universities.

The accumulated data consistently demonstrates that SHEMAR composite insulators deliver a service life exceeding 40 years — verified by theory, laboratory testing, and real-world operational performance.

18yrsLongest tracked service
±800kVWorld-first UHVDC
5,213mHighest altitude site
40+yrsProven design life

Typical UHV Substation Projects

World-first and record-setting converter stations where SHEMAR insulators continue to operate flawlessly after more than a decade in service.

Chuxiong Converter Station ±800kV · World First

Chuxiong ±800kV HVDC Converter Station

The world's first ±800kV UHVDC transmission project — a historic breakthrough marking China's transition from 0 to 1 in UHVDC technology. SHEMAR delivered 270 units in 2007. After 18 years of continuous operation under demanding conditions, every unit remains fully functional with zero quality abnormalities.

Voltage: ±800kV UHVDC
Units: 270
Delivered: 2007
Status: 18 yrs · No anomalies
Changji Converter Station ±1100kV · Highest Voltage

Changji ±1100kV UHVDC Converter Station

The world's first ±1100kV UHVDC project — highest voltage level, largest capacity, longest distance, and most advanced technology. SHEMAR delivered 1,267 units in 2016. After 9 years, zero quality abnormalities.

±1100kV
1,267 units
9 yrs · No anomalies
Liubei Converter Station ±800kV · Multi-terminal HVDC

Liubei ±800kV HVDC Converter Station

Marks China's command of UHV multi-terminal flexible DC transmission technology. SHEMAR delivered 790 units in 2019. Six years of continuous reliable operation with zero anomalies recorded.

±800kV
790 units
6 yrs · No anomalies

Typical UHV Transmission Line Projects

Long-distance backbone lines spanning thousands of kilometres, proving SHEMAR's reliability across extreme climates and environments.

Xiangjiaba-Shanghai Project DC ±800kV

Xiangjiaba–Shanghai DC±800kV UHVDC Project

1,107 SHEMAR units delivered in 2008. After 17 years of operation, all products continue to run reliably with zero quality abnormalities.

1,107 units · 2008
17 yrs · No anomalies
Jinping-Sunan Project DC ±800kV · Chain First

Jinping–Sunan DC±800kV UHVDC Project

SHEMAR was the first manufacturer of insulators used in extra-high tension composite insulator-on-chain configurations. 7,259 units delivered in 2011. 14 years of operation, zero quality abnormalities.

7,259 units · 2011
14 yrs · No anomalies
Qinghai-Tibet Project ±400kV · 4,000m+ Altitude

DC±400kV Qinghai–Tibet Project

Commissioned in 2011, this is the world's highest-altitude HVDC project — situated at an average elevation exceeding 4,000m with a peak site at 5,213m. UV radiation is 4–5× normal intensity, with temperatures down to −37.6°C (−35.7°F). SHEMAR deployed 6,790 units. As of 2025, 15 years of continuous stable operation with zero failures.

Altitude: 4,000m+
Min temp: −37.6°C (−35.7°F)
6,790 units · 2011
15 yrs · Zero failures

In-Service Performance Analysis

Systematic field-sampling and laboratory testing confirm that SHEMAR insulators maintain factory-equivalent performance across all key parameters after years of harsh field operation.

1000kV Jingmen Substation
3 Years Operation

1000kV AC Jingmen Substation

UHV hollow composite insulators maintain good appearance and high water-repellency. Mechanical, electrical, sealing, and material properties all meet standards with no significant degradation. Results confirm long-term reliability in UHV applications.

1000kV AC High humidity High UV
Jin-Su Yulong Station
6 Years Operation

±800kV HVDC Jin-Su Project — Yulong Station

Overall mechanical and electrical performance equivalent to factory initial state. Silicone rubber material analysis confirms the product can meet a design service life of 30+ years.

±800kV 1600m altitude 90% avg humidity
500kV Yuntian Substation
15 Years Operation

500kV Yuntian Substation, Zhuzhou, Hunan

All indicators show no significant change after nearly 15 years of continuous operation. Analysis projects the insulator will meet requirements for 40+ years of total service.

500kV 40.5°C (104.9°F) max 80% avg humidity
Yu-Guang Suidong Station
10 Years Operation

±800kV HVDC Yu-Guang Project — Suidong Station

The selected 500kV composite insulators show good operating characteristics after 10 years of field service, confirming capability for long-term continuous operation.

±800kV 38.6°C (101.5°F) max 86% avg humidity
Qinghai-Tibet Project
6 Years Operation

±400kV DC Qinghai–Tibet Project

Electrical, mechanical, and material properties almost identical to factory initial state after 6 years under extreme conditions: UV intensity 4–5× normal, temperatures to −37.6°C (−35.7°F), highest altitude 5,213m.

±400kV 5,213m altitude −37.6°C (−35.7°F) min
Jinping-Sunan Project
12 Years Operation

±800kV DC Jinping–Sunan Project

Electrical, mechanical, and material properties remain essentially identical to the initial factory state after 12 years of operation under severe environmental conditions — strong proof of 40-year design life.

±800kV High altitude Strong UV

Operational Product Data Summary

Historical service records from SHEMAR's long-term quality tracking programme, covering products from 2002 to present.

Year Installed Voltage Device Type Application Project Operating Condition Test Year Service Life Tested Total Operated
2002 500kV Hollow insulator Luodi Mashan Substation High temperature 2007 5 yrs 23 yrs
2002 220kV Hollow insulator Laoshan Substation Coastal 2019 17 yrs 23 yrs
2005 550kV Hollow insulator Hunan Yuntian Substation Inland humidity 2019 14 yrs 20 yrs
2009 500kV Hollow insulator Lingbao Converter Station High humidity 2019 10 yrs 16 yrs
2009 ±800kV Column insulators Suidong Substation High temp & humidity 2019 10 yrs 16 yrs
2009 1000kV Hollow insulator Hubei Jingmen Substation High humidity & UV 2011 3 yrs 16 yrs
2011 ±400kV Line insulators Qinghai–Tibet Project High altitude 2017 6 yrs 14 yrs
2012 ±800kV Column insulators Yulong Substation High temp & humidity 2018 6 yrs 13 yrs
2014 ±800kV Line insulators Xixie Project High humidity 2019 5 yrs 11 yrs
2012 ±800kV Line insulators Jinping–Sunan Project High altitude + strong UV 2024 12 yrs 13 yrs